Forty millimetres of pile puts this turf in the busiest part of the range: deep enough to look and feel like grass underfoot, short enough that a ball rolls true and a player can pivot without the surface grabbing. That balance is why this 40 mm artificial football turf ends up on surfaces that do several jobs — football training, five-a-side, basketball, PE lessons and weekend community games — rather than on one dedicated stadium pitch. We are a wholesale artificial football turf supplier, so it is cut to the sizes on your drawing and tufted in the face colour you approve. What players notice first is that it does not feel like a plastic mat. The pile has enough body to stand up after a slide, the surface stays usable after rain, and the green holds through a full outdoor season. For a facility that has to be open every week of the year, that reliability is the whole point. - Stable footing. The pile grips a boot without grabbing it, so players change direction on a shared court without the slip that comes from a worn, polished hard surface. - Cushioning where players land. On an artificial turf football field the 40 mm pile and the latex backing take the edge off a fall, which matters most where the surface is used by players of very different sizes. - Predictable ball response. A true roll and a consistent bounce come from an even pile over a flat, well-drained base, so the court does not develop the dead patches that make one end feel different from the other. - Colour that holds. The face is UV-resistant, so the green stands up to a summer of direct sun instead of washing out to grey by August — worth having on open courts with no shade at all. - Fewer closed days. No mowing, no watering and no seasonal line repainting, so 40 mm artificial football turf keeps the court open on days when a natural pitch would be called off.
How the sheet is built matters as much as the fibre. The PP net spreads load across the backing instead of letting it concentrate under a single tuft, and the SBR latex bonds the net, the pile and the base cloth into one stable layer. That is what stops a court developing ruts where players pivot, or a ripple where the sheet was rolled and re-rolled. A football turf manufacturer can copy a pile height easily; the backing is where the difference usually hides.
Drainage follows the same logic. Water passes down through the pile and the backing to the base beneath, so football artificial grass stays playable after heavy rain instead of holding a film of water on the surface. The sheet is dimensionally stable when wet, which keeps joins tight and stops panel edges lifting as the seasons pass.
Panels are cut to your dimensions and joined on site, so a court can be planned around its own markings, its own drainage falls and its own access. The same flexibility means a damaged section can be cut out and replaced without lifting the rest of the surface — a small point until the day a vehicle crosses the court.
The face is a blend of polypropylene and polyethylene. Polypropylene gives each blade its memory — it springs back after a boot or a ball flattens it — while polyethylene softens the hand and gives the green its depth. Getting that balance right is the part of the job a football turf manufacturer cannot fake: too much PP and the surface reads stiff and shiny, too much PE and the pile mats down under constant traffic. Here the blend is set for mixed use, where football boots and basketball shoes share the same sheet. Beneath the pile sits a PP net and an SBR latex backing. The latex locks the tufts in place and holds the sheet to its dimensions, so panels keep their shape through rolling, shipping, lifting and re-laying, and the build is waterproof with eco-friendly components. The same construction goes onto an artificial grass soccer field, a school yard or a rooftop court — what changes is the size it is cut to, not the quality of the build.




Day-to-day care is mostly brush work. Brushing against the pile direction once a week lifts the blades, redistributes the infill and stops traffic lanes forming down the middle of a court. Leaves, litter and anything that can block the drainage path should come off before it works its way into the pile, and the outlets around the perimeter are worth checking after heavy weather.
Infill migrates — towards the edges, into the corners, onto shoes. Top it up where it has thinned with the same grade the football turf manufacturer supplied, keep the levels even across the surface, and check the seams at the same time, because a lifted edge is quick to fix early and slow to fix later. Mud, drinks and bird droppings come off with water and a mild detergent; solvents and stiff wire brushes do more harm than the stain.
Once a season, walk the whole area and look at it as a player would: any hollow where water sits, any panel edge standing proud, any line marking lifting. A well-run artificial turf sports field is not a maintenance-free surface, but the routine is short, it needs no specialist crew, and it can be written onto the existing grounds schedule.
A sports complex almost never replaces everything at once. As an artificial football turf supplier we spend more time on phased work than on single-surface jobs: one court this season, the second next spring, the training area after that. The surface has to match across phases, so colour, pile and backing specification are held on file and repeated rather than re-matched from a photograph.
Inside an operating complex the real questions are access and continuity. An artificial turf sports field can be laid court by court while the rest of the site stays open, provided the base is protected, deliveries are scheduled outside peak hours and the contractor can work in sections. Where new surface meets old, falls and levels are checked so water still leaves the site in the direction it did before.
Complexes also collect surfaces. A pitch, a multi-sport court and a practice green are usually bought within a year or two of each other, and buying them to a common colour standard makes the site look planned rather than patched. Ask for the specification of each surface at quoting stage so the base contractor can price the whole site in one pass.
- Holiday-window refurbishments. Most school work has to be finished between the last day of term and the first day back, which puts the pressure on the base rather than the turf. Whether the job is one basketball court or a full artificial grass soccer field that doubles as the playing field, the panels can be cut and packed to suit the phased programme. - Mixed ages, mixed use. A surface used by six-year-olds at break and by adults in the evening needs predictable grip and a forgiving landing, and it needs to look presentable on open days without daily attention. - Buying for several sites. Councils, academy trusts and club groups often order wholesale artificial football turf for more than one location at a time; sticking to one specification means the maintenance team carries one set of spares and one method. - Stretched budgets. A surface that needs no watering, no mowing and no seasonal repainting frees maintenance hours and removes the line-marking cost from the annual budget. - Committee and tender approval. Specification sheets, colour references and the maintenance method can be prepared for the approval pack, so the people signing it off can see what is being bought rather than only a price.
| Model | QS012 |
|---|---|
| Pile height | 40 mm |
| Face fibre | Polypropylene (PP) and polyethylene (PE) |
| Density | 10,500 lbs |
| Yarn weight | 10,000 d |
| Backing | PP net with SBR latex |
| Water resistance | Waterproof backing |
| Weather resistance | UV-resistant for year-round outdoor use |
| Colour | Customized |
| Cut size | Made to your court dimensions |
| Panel format | Flat sheets, joined on site |
| Typical surfaces | Football, basketball and multi-sport courts |
Working as an export specialist from Nantong, Jiangsu, we build quality checks into every stage of an order rather than leaving them to the end. Before bulk production, yarn, colour and backing are confirmed against the approved sample; during production we check pile height, density, tufting and backing at the supplier; before loading, rolls, colours and packing are checked again and the inspection record is shared with you. If you prefer an independent eye, we can coordinate third-party inspection such as SGS or BV, book the visit and follow up on any defects found. Faulty rolls are replaced or credited before shipment, and each carton leaves with its packing list and inspection sheet.